Beaconsfield : driveway paving, excavation, drains and pavers

Tree-lined streets, an open ditch in front of some lots, houses from the 1950s and 1960s: in Beaconsfield, driveway paving, a French drain or a retaining wall has to be planned around all of it. Here we explain what the City requires and how we work around ditches and roots.

From summer cottages to a residential suburb

Beaconsfield is named after Benjamin Disraeli, Earl of Beaconsfield. Incorporated in 1910, it was for decades a place of summer cottages on Lac Saint-Louis, served by the railway and by Lakeshore Road, once known as the King's Road. It then grew quickly into a residential suburb in the 1950s and 1960s.

Permits for houses followed, area by area: Kensington Gardens in 1951, Elizabeth Gardens in 1953, Forest Garden in 1954, Drummond Park in 1955, then Edgewood Village in 1960, Beacon Hill in 1962 and Sherwood in 1963. Most residents live in single-family homes. On a house from that era, if the French drain and the driveway have never been redone, they're as old as the house.

Ditches, culverts and driveway paving under mature trees

In front of some lots, rainwater runs into an open ditch, with a culvert under the driveway. The City is clear about it: an open ditch handles heavy rain better than underground pipes, because it holds the water and slows it down. Adding soil to a ditch could alter the natural slope of the land and cause damage, and both ends of a culvert have to stay clear.

Trees call for the same care. Beaconsfield's canopy is shrinking, mainly because its mature urban forest is aging and many trees planted in the 1950s are reaching the end of their life. The City wants to slow the loss: every felled tree must be replaced. Near a tree that's staying, we plan the trench and the machinery route around the root protection zone.

What the City of Beaconsfield requires before work starts

Merged into Montréal on January 1, 2002 and reconstituted on January 1, 2006, Beaconsfield is still part of the Montréal agglomeration but issues its own permits. A permit is required to build or change a driveway or parking area, and the allowed area is set as a share of the front yard, smaller on a corner lot. Using a culvert is a separate request. The permit page says nothing about French drains or repaving a driveway without changing it, so before starting, we ask the City's urban planning department whether that work needs approval.

Fill or excavation work requires a land surveyor's site plan showing existing and projected geodetic levels. A retaining wall requires a certificate of location showing where it will go and a technical cross-section of the wall, drainage system included. On the lakeshore, landscaping the shoreline strip requires a surveyor's certificate showing the high-water line and a plan signed by a landscape architect.

Felling a tree on private property without a certificate of authorization is prohibited, except below the diameter exempted by the by-law. During the work, every tree being kept must be protected by a sturdy fence, put up before the job starts and outside the root protection zone; when that isn't possible, the trunk is protected and the root zone is covered with a permeable geotextile membrane. Demolition follows its own process, which takes longer if the main building was built before 1940.

Driveway paving and other work in Beaconsfield

Ditches, trees and by-laws change how we handle each type of work in Beaconsfield, from paving to landscaping.

Asphalt

When the driveway crosses a culvert, we pave it without touching the ditch: no added soil, both ends of the culvert kept clear, and a slope that sends water to the ditch rather than the garage. Driveway paving still starts with the basics: a well-compacted stone base under the asphalt.

Parking lots

In a city of tree-lined streets, parking lots at apartment buildings, schools and businesses fill up with leaves in the fall and sand in the spring. Parking lot sweeping clears them out before they clog the catch basins and hold water on the asphalt, which wears the surface faster.

Excavation and demolition

For fill or excavation, the City asks for a land surveyor's plan with existing and projected levels. Our excavation and grading follows those levels: we correct slopes to carry water away from foundations, without filling the ditch, and keep machinery out of the protection zone of trees being kept.

French drains

On a house from the 1950s or 1960s whose drain has never been replaced, the new drain may have to go all the way around. Once the foundation is exposed down to the footing, we apply a waterproofing membrane to the wall before backfilling: it keeps water in the soil off the concrete and guides it to the new drain.

Pavers and landscaping

For a retaining wall, the City requires a drainage system and a technical cross-section that shows it. A retaining wall holds thanks to its compacted stone base and the drainage behind it: without drainage, water builds up behind the blocks, pushes on the wall and shifts it when it freezes.

Planning something else on your property?

Tell us about the work. We'll call you back to discuss it and prepare your quote.

514 231-1615Free quote

How we get to Beaconsfield

From Lachine, we cross Dorval and Pointe-Claire, either by Highway 20, which serves Beaconsfield at Boulevard Saint-Charles and Avenue Woodland, or along Lakeshore Road, which follows the lake from one town to the next. Boulevard Saint-Charles also leads north to Highway 40. Beaconsfield borders Pointe-Claire to the east, Kirkland to the north and Baie-D'Urfé to the west.

Frequently asked questions

Can I fill in the ditch in front of my Beaconsfield home to widen the driveway?

Not on your own. The City asks residents not to add soil to the ditch, which could alter the natural slope of the land and cause damage, and it points out that an open ditch holds water from heavy rain and slows it down. To widen a driveway, you need a driveway permit, and using a culvert is a separate request, so we check with the City before touching the ditch.

How is a tree protected during excavation in Beaconsfield?

The fence goes up before the work starts, around every tree that stays, outside the root protection zone, and it stays up until the end. When that isn't possible, the trunk is protected and the root zone is covered with a permeable geotextile membrane. A tree is never used as an anchor or a support for the work.

What does the City of Beaconsfield need for fill work or a retaining wall?

For fill or excavation, a land surveyor's site plan with existing and projected geodetic levels. For a retaining wall, a certificate of location showing where it will go and a technical cross-section of the wall with its drainage system. Before digging, we also have underground utilities located through Info-Excavation, a free service. Next step: planning an excavation project.

Does a felled tree have to be replaced in Beaconsfield?

Yes. The City wants to slow the loss of its canopy, so every tree it authorizes for felling must be replaced within the time set by the by-law; a deposit is required and refunded once the tree is replaced. Owners also look after the trees on the grassy part of the public right-of-way in front of their property.

Get your free quote