Lachine, West Island of MontrealRBQ licence 5735-9689-01

legroupedentretiensl@hotmail.com514 231-1615

Block wall and crushed stone

Retaining walls : block walls built to stand up to soil, water and frost

A retaining wall holds back soil that pushes, water that builds up and, in winter, frozen ground that swells. We build it with that in mind: a compacted stone base, a level first course, courses set back into the slope, clear stone and a drain behind the blocks, and glued capstones. Along a garage driveway, at the edge of a flower bed or wherever the ground changes level.

What a retaining wall holds back

Behind a retaining wall, the soil is always pushing forward. When it's wet, it gets heavier and the water adds its own pressure. When it freezes, it swells and pushes harder still. That push grows much faster than the height of the wall, and a driveway, a parking area or a slope above adds to it. Clay, which lies under many properties in western Montreal, holds water longer and pushes harder.

So a retaining wall is a complete structure: a base, a first course, courses that step back into the slope, drainage and compacted backfill. You pick the blocks for their look, but it's everything else that keeps the wall standing. A decorative wall that edges a flower bed or a paver walkway without holding back much asks for less, but it still needs a compacted base: without one, frost lifts it in sections and it ends up wavy.

Drainage behind the wall

A wall that can't drain will eventually lean. Behind the blocks, we build up a zone of clear stone, crushed stone with no fines, so water drops down through it to the bottom instead of pressing on the blocks. At the bottom, a perforated drain collects that water and carries it to an outlet, at the end of the wall or lower on the property. Geotextile fabric between the soil and the stone keeps fine particles from clogging the drainage.

A drain with no outlet does nothing, so we decide where the water will go before digging, and never against a garage door or the house. This isn't the house's French drain, which protects the foundation, but the two are planned together when the wall is close to the building. Up top, the finished grade and the downspouts should keep water away from the back of the blocks.

Base, first course and setback

We dig a trench, remove soft soil and compact a crushed-stone base, dead level. On sloping ground, the base steps down in levels rather than following the slope. The first course is partly buried and adjusted block by block, along the length and from front to back: even a small error at that level is repeated, and magnified, in every course above.

Each course then steps back slightly toward the soil, so the wall leans into the slope instead of standing straight up. Many blocks have a lip at the back that sets the setback. The backfill is compacted course by course, with light equipment near the blocks. For a taller or more heavily loaded wall, layers of geogrid anchored into the backfill may be added, according to the plans. Capstones, glued with an adhesive made for concrete, finish the top.

Signs a wall isn't holding

Not every sign means the wall has to be rebuilt, but each one is worth a look at what's happening behind the blocks.

It leans or bulges

The top sits farther forward than the bottom, or the middle bows out. The soil and water are pushing harder than the wall can hold: missing or clogged drainage, too little setback or a base that gave way. It won't straighten on its own, and what sits above it follows.

Blocks are shifting

Blocks drift out of line, joints open up or capstones come loose. On a wall that's still straight, a loose cap simply gets reglued. Blocks that move a little more every spring point to a base that's moving with the frost.

Water or soil at the base

Water seeping out between the blocks means it has no other way out. Soil washing out at the base is more serious: the backfill is draining away through the joints, and the wall is losing what supported it.

The ground sinks behind it

A dip or a crack in the ground just behind the wall shows backfill that's settling or washing away. It's often what people notice before a wall starts to lean.

Building a retaining wall, step by step

  1. Layout and checks

    We mark out the line and height, have underground utilities located through Info-Excavation and check what the municipality requires.

  2. Trench and base

    We dig the trench, remove soft soil and compact the crushed-stone base, stepping it down if the ground slopes.

  3. First course

    The first blocks are set partly buried and levelled one by one, along the length and from front to back.

  4. Courses and drainage

    The drain goes in at the base. Each course steps back slightly, the clear stone and fabric rise behind it, and the backfill is compacted course by course.

  5. Caps and finishing

    We glue the capstones, then shape the soil above to keep water off the back of the wall.

Frequently asked questions

Do I need a permit to build a retaining wall?

It depends on the municipality, the height of the wall and where it goes. A retaining wall may require a permit, and plans from an engineer may be required depending on its height or what it holds back. Near a lake, a river or a property line, other rules may apply. We check these requirements with you before settling on the height and location, as part of the quote.

Why is my retaining wall leaning?

The usual causes are missing or clogged drainage behind the blocks, a poorly compacted base, courses built with no setback, or a load above that the wall wasn't designed to carry, like a driveway. A leaning wall can't be pushed back into place: we take down the affected section, correct the base and drainage, and rebuild it, often with the same blocks.

Can a wall be built along a sloping driveway?

Yes, it's common where the driveway slopes down to the garage: the wall holds back the higher ground beside it. Its base has to sit lower than the driveway's base, so digging for an asphalt driveway or pavers doesn't undermine it. And we decide ahead of time where its drain empties, so the water doesn't end up against the garage door.

My yard slopes: do I need a wall?

Not always. A gentle slope can simply be graded and planted: that's landscaping work, with no wall. A wall makes sense when you want a flat area, a raised flower bed or a path along a grade change. For a large change in grade, two lower walls set back in tiers sometimes replace one tall wall, but the spacing has to be worked out: too close, and the upper wall loads the lower one.

Get your free quote

Tell us about the work you need. We'll call you back to discuss it and prepare your quote.

Request a quote