
Line striping : painting and repainting your parking lot lines
On a new parking lot, we lay out and paint every marking; on an existing one, we repaint faded lines or rework the layout. Stalls, drive aisles, arrows, accessible spaces, hatched zones and numbers all start from a striping plan agreed on with you, then get painted on clean, dry asphalt when the lot is at its quietest.
What each marking does
Stall lines mark out each vehicle's space, and their layout sets how many cars the lot can hold. Arrows show which way each aisle runs; in a one-way lot, they keep drivers from coming in through the exit. Hatched and no-parking zones keep clear the spots where nobody should stop: in front of an exit door, a garage door or a loading dock.
Reserved spaces put each user in the right place, for example deliveries near the service door and visitors near the main entrance. In a condo or office building, stall numbering follows your list of assigned spaces, so each number painted on the pavement matches the right tenant or co-owner.
The striping plan comes before the paint
A new layout, on a freshly paved parking lot or after resurfacing, starts with a plan: where the stalls go, how wide the drive aisles are, which way each one runs and how pedestrians get to the doors. Angled stalls go with one-way aisles; perpendicular stalls allow traffic in both directions. The plan is then transferred to the pavement with reference marks before any painting.
Rules for accessible parking spaces aren't the same everywhere: they vary from one municipality to the next and with the type of building. Before painting, we confirm with you how many spaces are needed, where they go in relation to the accessible entrance and the path to the door. Then we paint the space, its wheelchair symbol and the hatched aisle beside it.
What makes line paint last
Line paint bonds to asphalt, not to the sand and dust sitting on top of it. So the job starts with sweeping the surface, and then we wait until everything is dry: pavement still wet from morning dew or from washing won't hold paint properly. We also skip days when rain is expected, since a shower can ruin paint that hasn't dried.
When sealcoating is planned, it goes down before the lines, and the paint waits until the sealer has fully dried: applied over fresh sealer, it won't bond well. Beyond that, timing depends on how busy the lot is. A store gets striped when it's closed or nearly empty, an office building once staff have left, a condo lot when residents can move their cars.
Signs it's time to repaint
Lines fade so gradually that people stop noticing. It's often the users who show it's time to act. Our guide on when to repaint parking lot lines gives more pointers.
Drivers going the wrong way
When arrows can no longer be read, drivers come in through the exit or head up a one-way aisle. That's the most pressing sign: in a parking lot, pedestrians don't expect a car to come at them from the wrong direction.
Reserved spaces being taken
A delivery or visitor space whose markings have worn off ends up being used by anyone. Tenant complaints and double-parked delivery trucks often show up before anyone notices how worn the paint is.
Paint that's flaking
Lines coming off in patches aren't just worn out: the paint didn't bond properly, often because the surface was dirty or damp. Before repainting, we remove anything loose; otherwise the new paint comes off with the old.
Repaired sections with no lines
After an asphalt repair or resurfacing, the new sections have no markings, and a row of stalls cut in half is hard to read. We repaint the affected sections in line with the stripes around them.
Steps in a line striping job
Site visit
We look at the condition of the pavement and lines, the current layout, the entrances and the hours when the lot is busiest.
Plan approved with you
Stall layout, traffic direction, reserved spaces and accessible spaces: we agree on the plan and on when the work will be done.
Surface preparation
Sweeping, removing flaking paint and making sure the asphalt is dry everywhere before any painting starts.
Painting
Reference marks first, then lines, arrows, symbols and numbers, one section at a time so part of the lot stays open.
Check and reopening
We check that the layout is straight and sharp; each section reopens to traffic once its paint is dry.
Our jobs
Frequently asked questions
Is line striping the same as pavement marking?
Mostly, yes. Line striping, or line painting, usually refers to the lines themselves, while pavement marking covers everything painted on the surface: lines, arrows, symbols, hatched zones and numbers. Your free quote spells out exactly what will be painted, item by item.
Can lines be painted on new asphalt?
Yes, once the surface has cooled and hardened. Keep in mind, though, that the first coat of sealer, usually applied six to twelve months after paving, covers that first layout. So plan on repainting the lines once the sealer is dry. Our sealcoating guide explains that waiting period.
How long before you can drive on freshly painted lines?
Drying time varies with the type of paint, the heat and the humidity in the air: in warm, dry weather, it goes faster. The section that was just painted stays closed until it's dry, and we let you know when it can reopen. Driving on it too soon leaves tire marks and smears paint outside the lines.
Can the stall layout be changed when the lines are repainted?
Yes. Repainting is a chance to rethink a layout that no longer fits how the lot is used: more deliveries, new tenants, stalls that are too tight. If you want to add stalls by making them narrower, check your municipality's bylaws first. The old lines then have to disappear; in many cases, sealcoating the whole surface covers them before the new layout goes down.
See also

Sealcoating
Asphalt
Repairs first, a cleaned surface, sealer in dry, mild weather, then lines repainted in parking lots: protection for asphalt that's still in good shape.
Learn more
Parking lot sweeping
Parking lots
Winter sand and grit in spring, leaves in fall, and pressure washing wherever a sweeper alone isn't enough.
Learn more
Maintenance contracts
Parking lots
Sweeping, repairs, sealcoating and line striping combined into one annual plan, with priorities and a budget set in advance and a review at the end of the season.
Learn moreAreas we serve
We lay out and repaint parking lot lines in each of these areas, working from our base in Lachine.
Get your free quote
Tell us about the work you need. We'll call you back to discuss it and prepare your quote.
Request a quote






